Map of Polarnode data center projects in Finland
ProjectGrid capacityPlotStatus
Lappeenranta310 MW35 haPre-construction
Kuopio200 MW32 haIn development
Keminmaa>500 MW109 haIn development
Nokia100 MW12.4 haIn development
Pori>90 MW26 haDivested
  1. 01

    Lappeenranta

    Pre-construction
    Lappeenranta site with its area outline
    Location
    Lappeenranta, Pajarila
    Plot type
    Unbuilt industrial area
    Size of the plot
    35 ha
    Master plan status
    Legally valid
    Max available grid capacity
    310 MW
    Time to power
    Max 2 years
    Connectivity
    Available to site
    Water & sewerage access
    Available to site
    Waste heat utilisation
    Available to site
    View project →
  2. 02

    Kuopio

    In development
    Kuopio site with its area outline
    Location
    Kuopio, Mustakorpi
    Size of the plot
    32 ha
    Permitting status
    Ongoing
    Maximum available grid capacity
    200 MW
    Time to power
    2028
    Connectivity
    Available to site
    Water & sewerage access
    Available to site
    Waste heat utilisation
    Available to site
    View project →
  3. 03

    Keminmaa

    In development
    Keminmaa site with its area outline
    Location
    Keminmaa, Sarvenmaa
    Site area
    109 ha
    Zoning status
    Ongoing
    Power grid capacity
    >500 MW
    Time to power
    2028
    Connectivity
    Under assessment
    Water & sewerage access
    Under assessment
    View project →
  4. 04

    Nokia

    In development
    Nokia site with its area outline
    Location
    Nokia, Kyynijärvi
    Plot type
    Unbuilt industrial area
    Size of the plot
    12.4 ha
    Master plan status
    Pending
    Max available grid capacity
    100 MW
    Time to power
    Max 2 years
    Connectivity
    Available to site
    Water & sewerage access
    Available to site
    Waste heat utilisation
    Available to site
    View project →
  5. 05

    Pori

    Divested
    Pori site with its area outline
    Location
    Pori, Honkaluoto
    Size of the plot
    26 ha
    Permitting status
    Legally valid
    Maximum available grid capacity
    >90 MW
    Time to power
    Max 2 years
    Connectivity
    Available to site
    Water & sewerage access
    Available to site
    Waste heat utilisation
    Available to site
    View project →